Home » Products »

Electric Hoverboard

Delivery term:The date of payment from buyers deliver within days
  • Price:

    Negotiable

  • minimum:

  • Total supply:

  • Delivery term:

    The date of payment from buyers deliver within days

  • seat:

    Beijing

  • Validity to:

    Long-term effective

  • Last update:

    2017-11-20 02:00

  • Browse the number:

    354

Send an inquiries
+
Shanghai Yanteng International Trade Co.,Ltd
Contactaixin:

Contactaixin:

yanteng(Mr.)  

Email:

telephone:

Area:

Beijing

Address:

Rm 608, #2 Building, No. 1080, Changyang Rd, Yangpu District, Shanghai, China

Website:

http://www.cnluggagefty.com/ http://yanteng.xmkaofu.com/

+


electric hoverboard



Detailed spec.:  










































Item No.




YT-0100(10inch)




Product Size




66*27*27CM




Color




Black,Blue,Red,Graffiti




Product Weight




16KG




Maximum loading




120kg




Max Speed




18KM\H




Motor power




700W(350W*2)




Charging voltage




AC 100V~240V




Charging time




2-3H




Endurance Mileage




20-30KM (depend on driver's weight)




Battery




44000mAh,158W, Lithium polymer battery




The tire size




10 inch




Climbing Slope




15 -20 degree




Water/dustproof levels




IP54




Material of body




ABS+PC




Packaging




72*35*35CM,1PCS/CTN, G.W:16.50KG




Accessories




1)Charger








2)User Manual








3)With LED light



Remark



Below function or accessories are available with extra cost







Samsung Battery




Remote Controller




LG Battery



Way of packing



1pc/polybag, 1pc/inner colorful carton, 1pc/export carton, with foam fully protected



Packing information:



























size

N.W.

item size

carton size

loading qty

width

thickness

height

width

thickness

height

20GP

40GP

40HQ

10"

16

27

27

66

35

25

72

252

672

784


Our Services



●Fast delivery time: 30-35days after order confirmation



●Fast sample lead time: 7-10days



●Low MOQ: 300pcs



●Competitive price



●Quality assurance, each production line with TWO QC and inspect piece by piece before packing



●For each order will offer certain qty of spare parts free of charge for repair purpose



●Fast reaction, high-efficient and accurate communication with customers and follow up each order closely



Trade & Payment term



FOB/CIF/EXW etc.



T/T(30% deposit+70% before shipment)